Terabase Energy Terafab

by Terabase Energy, Inc. · US

An automated field factory set up on a utility-scale solar site: robots mount PV modules onto tracker torque tubes with in-line quality checks, and rovers carry the assemblies to the rows, where workers place them on the trackers.

Terafab V2 robot arm handling a solar module on the outdoor assembly line during field testing
Photo · From terabase.energyNo redistributable 3D model

Buy in Germany

checked 2026-10-05

Sellers, prices and stock as their pages showed them. No enquiry is sent from this site.

Not sold hereNot sold in Germany

Deployed only on US projects; the current version is built for First Solar Series 7 modules and Nextpower trackers. Terabase's 2026 move into Europe (Paris R&D office) covers its Construct software, not Terafab. No European offer, partner or project found.

Checked 2026-10-05. Maker’s page ↗

Key facts

All specifications
Moves on
Not published
Height
Not published
Weight
Not published
Arms

2

Hands

Grippers

Payload per arm
Not published
Carry on body
Not published
Runtime
Not published
Max speed
Not published
Stairs
Not published
Outdoors

Yes

IP rating
Not published

Jobs

No job on the map fits this robot yet.

Where it has worked

202220232024202520262022 · Tested in a pilot · Field test: built 10 MW of a 400 MW solar site · 400 MW solar project, Texas, USA2023-11 · In daily use · First commercial project: installed 17 MW of the 225 MW White Wing Ranch solar plant; no manual lifting of steel tubes or panels; 25% higher labour productivity than manual installation · White Wing Ranch, Arizona, USA (developer Leeward Renewable Energy, EPC RES)2026-03 · In daily use · First-generation system used on five solar power plant projects · Commercial projects in the USA2026-03 · Shown in a demo · Second-generation system completed field testing and was declared ready for commercial shipment · Field test site, USA (not named)
In daily useTested in a pilotShown in a demo
  • Tested in a pilot

    Field test: built 10 MW of a 400 MW solar site · 400 MW solar project, Texas, USA · 2022

    First-generation system.

    Terabase Energy ↗
  • In daily use

    First commercial project: installed 17 MW of the 225 MW White Wing Ranch solar plant; no manual lifting of steel tubes or panels; 25% higher labour productivity than manual installation · White Wing Ranch, Arizona, USA (developer Leeward Renewable Energy, EPC RES) · 2023-11

    First-generation system.

    Terabase Energy ↗
  • In daily use

    First-generation system used on five solar power plant projects · Commercial projects in the USA · 2026-03

    The maker's product page gives over 100 MW installed on US projects; a pv magazine interview in April 2026 gives 40 MW for the first version.

    Terabase Energy ↗
  • Shown in a demo

    Second-generation system completed field testing and was declared ready for commercial shipment · Field test site, USA (not named) · 2026-03

    Terabase Energy ↗

Specifications

6 values

Specifications by configuration

1 configuration

What each version's maker or seller states, with the exact source text. A source label says who makes the claim, not that it is proven; unknown means not published.

Terabase Energy Terafab6 specifications · 7 research gaps · reviewed Show all 6 specifications and capabilities
Cycle time
2 minManufacturer sourceTerabase Energy ↗ · checked

one line, V2

Installed capacity per week
20+ MW/weekManufacturer sourceTerabase Energy ↗ · checked

one line running 24/7 (V2); maker gives roughly 1 GW per factory per year

Time to move the factory
4 hReported · presspv magazine ↗ · checked

V2, CEO statement in trade press

Modules and trackers
First Solar Series 7 modules, Nextpower trackersReported · presspv magazine ↗ · checked

current version; versions for silicon modules and other trackers announced

Productivity
2xManufacturer sourceTerabase Energy ↗ · checked

maker claim for V2 versus traditional stick-build

Measured labour productivity gain
25 %Manufacturer sourceTerabase Energy ↗ · checked

first-generation system on its first commercial project, versus manual installation

Capabilities and equipment

Legs
NoField-level source not recorded
Wheels
NoField-level source not recorded
Tracks
NoField-level source not recorded
Level floors
NoField-level source not recorded
Rough ground
Unknown
Stairs
Not applicable
Outdoor use
YesField-level source not recorded
Number of arms
2Field-level source not recorded
Hands or end effectors
GripperField-level source not recorded
Hands included
YesField-level source not recorded
Payload per arm
Unknown
Payload on body or base
Unknown
Runtime
Unknown
IP rating
Unknown
SDK / development interface
Unknown

Operating conditions and configuration notes

  • A relocatable assembly line set up on the solar site, not a mobile robot; industrial robot arms unpack and handle modules and torque tubes (number of arms not stated; set to 2 as the trade press speaks of arms in the plural).
  • Purpose-built rovers carry the finished assemblies to the rows; their drive type is not stated, so wheels and tracks are left false.
  • In the current version workers unload the assemblies from the rovers and fit them onto pre-placed tracker mounts; the maker plans to automate this step in 2027.
  • Built for outdoor work in heat, dust, wind, rain and mud.
  • Availability (April 2026): two deployable factories, a third expected by the end of 2026, ten in Q2 2027 (CEO in trade press).

Still missing for Terabase Energy Terafab

Payload per arm · Payload, both arms · Payload · Runtime · IP rating · Rough ground · SDK / development interface

Background sources for the capability record

These sources are attached to the record as a whole. Only a source displayed beside a value is linked to that field.

More detail

Evidence profileShow

Robot evidence profile

Checked

Evidence for each configuration

Claims, demonstrations, pilots and deployments describe different levels of evidence. A demonstration does not establish working-site readiness.

Terabase Energy Terafab1 demonstration · 1 pilot · 2 deployments · 6 missing capability fields
  1. Pilot

    Field test: built 10 MW of a 400 MW solar site

    400 MW solar project, Texas, USA · 2022

    First-generation system.

    Terabase Energy ↗ · Manufacturer source · checked

  2. Deployment

    First commercial project: installed 17 MW of the 225 MW White Wing Ranch solar plant; no manual lifting of steel tubes or panels; 25% higher labour productivity than manual installation

    White Wing Ranch, Arizona, USA (developer Leeward Renewable Energy, EPC RES) · 2023-11

    First-generation system.

    Terabase Energy ↗ · Manufacturer source · checked

  3. Deployment

    First-generation system used on five solar power plant projects

    Commercial projects in the USA · 2026-03

    The maker's product page gives over 100 MW installed on US projects; a pv magazine interview in April 2026 gives 40 MW for the first version.

    Terabase Energy ↗ · Manufacturer source · checked

  4. Demonstration

    Second-generation system completed field testing and was declared ready for commercial shipment

    Field test site, USA (not named) · 2026-03

    Terabase Energy ↗ · Manufacturer source · checked

What is still missing

Payload per arm · Payload, both arms · Payload · Runtime · IP rating · Rough ground

  • Is Terafab sold or leased to EPCs, or only run by Terabase as a service, and at what price?
  • Any plan to offer Terafab in Europe or for European module and tracker types?
  • Number of robot arms per line and the drive type and payload of the delivery rovers.