
Buy in Germany
checked 2026-10-02Sellers, prices and stock as their pages showed them. No enquiry is sent from this site.
Sold direct business to business by the US maker (Newark, NJ): purchase, lease or financing. No European seller, office or customer found; the maker only says each platform can be configured for ATEX Zone 2 in Europe.
Checked 2026-10-02. Maker’s page ↗
Key facts
All specifications- Moves on
Wheels
- Height
- Not published
- Weight
- Not published
- Arms
1
- Hands
Process tool
- Payload per arm
- Not published
- Carry on body
- Runtime
15 to 18 h
base platform at 500-600 W draw; runtime with work cell not stated
Maker · raiserobotics.ai ↗- Max speed
- Stairs
- Not published
- Outdoors
- Not published
- IP rating
- Not published
Jobs
In daily use 2
- Drill anchor holes overhead for the installationsIn daily use · JR Butler, St. Jude Children's Research Hospital (USA); DPR Construction and Enclos shown as project logos
- Mark wall lines and openings on the slabIn daily use · JR Butler, St. Jude Children's Research Hospital (USA); DPR Construction and Enclos shown as project logos
Did similar work 1
- Hang the substructure of a suspended plasterboard ceilingDid similar work · Layout, drilling and curtain-wall embed work with US contractors
Specs fit 17
- Check finished elements against their tolerances and record the resultPrecast concrete plant
- Document cracks and coating damage in parking decksInspection of infrastructure assets
- Drill anchor holes in the lift shaft for the guide rail bracketsLifts and escalators
- Drill and set insulation anchors through the boardsExternal insulation and render systems (ETICS)
- Hang rectangular sheet-metal ducts under the ceilingVentilation and air conditioning
Show 12 more
- Inspect and document elements before they leave the hallPrefab timber house factory
- Inspect bridges under DIN 1076Inspection of infrastructure assets
- Inspect new sewers by camera before acceptanceDrainage sewers
- Install prestressed ground anchors for a retaining wallSpecialist foundation works
- Mount the aluminium sub-structure: wall brackets and railsRainscreen facades
- Patrol substations for hot spots and gauge readingsInspection of infrastructure assets
- Patrol utility and cable tunnelsInspection of infrastructure assets
- Photograph installations before ceilings and shafts closeSurvey, layout and documentation
- Scan the as-built state and compare it with the modelSurvey, layout and documentation
- Stake out kerb lines and points for the road worksRoads, paths and paving
- Walk inspection rounds through plant roomsFacility operation and building inspection
- Walk the shell and capture progressSurvey, layout and documentation
Where it has worked
- In daily use
Layout, drilling and curtain-wall embed work with US contractors · JR Butler, St. Jude Children's Research Hospital (USA); DPR Construction and Enclos shown as project logos
Only the JR Butler case names a project.
Raise Robotics ↗
Specifications
9 valuesSpecifications by configuration
1 configurationWhat each version's maker or seller states, with the exact source text. A source label says who makes the claim, not that it is proven; unknown means not published.
Raise Robotics Work Cell on AGVon Raise AGV9 specifications · 7 research gaps · reviewed Body / base payload 500 kgRuntime 15-18 hShow all 9 specifications and capabilities
- Layout print accuracy
Mark configuration
- Configurations
- Mark, Drill, Fasten, Scan (deployed); Coat (pre-release)Manufacturer sourceRaise Robotics ↗ · checked
- Platforms
- AGV base weight
base platform only
- AGV design payload
base platform only; the work cell counts against it
- Top speed
peak; 5.3 km/h rated
- Continuous grade
base platform; 35° peak
- Battery
LiFePO4, 51.2 V, 200 Ah
- Runtime
base platform at 500-600 W draw; runtime with work cell not stated
Capabilities and equipment
- Legs
- NoField-level source not recorded
- Wheels
- YesField-level source not recorded
- Tracks
- NoField-level source not recorded
- Level floors
- YesField-level source not recorded
- Rough ground
- Unknown
- Stairs
- Not applicable
- Outdoor use
- Unknown
- Number of arms
- 1Field-level source not recorded
- Hands or end effectors
- ToolField-level source not recorded
- Hands included
- YesField-level source not recorded
- Payload per arm
- Unknown
- Payload on body or base
- Unknown
- Runtime
- Unknown
- IP rating
- Unknown
- SDK / development interface
- Unknown
Operating conditions and configuration notes
- Not available in Germany.
- Omnidirectional four-wheel base; the fitted tool sets the job (mark, drill, fasten or scan).
- The same work cell can also be mounted on Genie scissor and boom lifts.
Still missing for Raise Robotics Work Cell on AGV
Payload per arm · Payload · Runtime · IP rating · Rough ground · Outdoor use · SDK / development interface
Background sources for the capability record
These sources are attached to the record as a whole. Only a source displayed beside a value is linked to that field.
- Raise Robotics home page ↗Manufacturer source · checked
- Raise V4 AGV specifications and pricing ↗Manufacturer source · checked
More detail
Evidence profileShowHide
Robot evidence profile
CheckedEvidence for each configuration
Claims, demonstrations, pilots and deployments describe different levels of evidence. A demonstration does not establish working-site readiness.
Raise Robotics Work Cell on AGV1 deployment · 6 missing capability fields
Configuration: on Raise AGV
- Deployment
Layout, drilling and curtain-wall embed work with US contractors
JR Butler, St. Jude Children's Research Hospital (USA); DPR Construction and Enclos shown as project logos · Event date not recorded
Only the JR Butler case names a project.
Raise Robotics ↗ · Manufacturer source · checked
What is still missing
Payload per arm · Payload · Runtime · IP rating · Rough ground · Outdoor use
- Any plan for Europe or CE marking.
Sources
2 pages- Raise Robotics home page ↗Raise Robotics · manufacturer · checked 2026-10-02
- Raise V4 AGV specifications and pricing ↗Raise Robotics · manufacturer · checked 2026-10-02