Buy in Germany
checked 2026-11-18Sellers, prices and stock as their pages showed them. No enquiry is sent from this site.
Sold on request by the Progress Group from Brixen (Italy, EU). No price published and no German installation found; the first unit runs in Austria. The maker's product pages beyond the shuttering robot returned 403 to the polite reader.
Progress Maschinen & Automation AG IT · manufacturer
Checked 2026-11-18.
Key facts
All specifications- Moves on
- Not published
- Height
- Not published
- Weight
- Not published
- Arms
1
- Hands
Process tool
- Payload per arm
- Not published
- Carry on body
- Not published
- Runtime
- Not published
- Max speed
- Not published
- Stairs
- Not published
- Outdoors
- Not published
- IP rating
- Not published
Jobs
In daily use 1
- Place electrical boxes, conduit and small inserts before concretingIn daily use · Mischek Systembau GmbH, Gerasdorf near Vienna, Austria
Where it has worked
- In daily use
Bends and lays heating and cooling hoses for activated-core floor slabs in three shifts, up to 300 m² a day · Mischek Systembau GmbH, Gerasdorf near Vienna, Austria · 2023-08
First installation; the article says output goals were far exceeded in the first full year.
BFT International ↗
Specifications
3 valuesSpecifications by configuration
1 configurationWhat each version's maker or seller states, with the exact source text. A source label says who makes the claim, not that it is proven; unknown means not published.
Progress Tube Master pipe-laying robot3 specifications · 7 research gaps · reviewed Show all 3 specifications and capabilities
- Task
- bending and laying heating and cooling pipes for activated concrete coresReported · pressBFT International ↗ · checked
Exact source text
bending and laying pipes for precast concrete elements with activated concrete core
- Laying position
Exact source text
The system is capable of laying pipes directly on top of the previously inserted reinforcement and replaces tedious manual work
- Daily output
up to; 3-shift operation at Mischek Systembau
Exact source text
Quote context: up to; 3-shift operation at Mischek Systembau
The Tube Master is currently running a 3-shift operation from Sunday, 10 pm, to Friday, 10 pm, with a daily output of up to 300 m².
Capabilities and equipment
- Legs
- NoField-level source not recorded
- Wheels
- NoField-level source not recorded
- Tracks
- NoField-level source not recorded
- Level floors
- YesField-level source not recorded
- Rough ground
- Unknown
- Stairs
- Not applicable
- Outdoor use
- Unknown
- Number of arms
- 1Field-level source not recorded
- Hands or end effectors
- ToolField-level source not recorded
- Hands included
- YesField-level source not recorded
- Payload per arm
- Unknown
- Payload on body or base
- Unknown
- Runtime
- Unknown
- IP rating
- Unknown
- SDK / development interface
- Unknown
Operating conditions and configuration notes
- Works in a pallet circulation plant; it was fitted into an existing line for semi-finished precast components while production continued.
- Pipes still need fastening on the pallet after laying (minimum rework, per the article).
- Robot type (gantry or arm), pipe diameters and speed are not given in the text read.
Still missing for Progress Tube Master pipe-laying robot
Payload per arm · Payload · Runtime · IP rating · Rough ground · Outdoor use · SDK / development interface
Background sources for the capability record
These sources are attached to the record as a whole. Only a source displayed beside a value is linked to that field.
- Automated bending and laying of cooling and heating pipes (BFT 08/2023) ↗Reported · press · checked
More detail
Evidence profileShowHide
Robot evidence profile
CheckedEvidence for each configuration
Claims, demonstrations, pilots and deployments describe different levels of evidence. A demonstration does not establish working-site readiness.
Progress Tube Master pipe-laying robot1 deployment · 6 missing capability fields
- Deployment
Bends and lays heating and cooling hoses for activated-core floor slabs in three shifts, up to 300 m² a day
Mischek Systembau GmbH, Gerasdorf near Vienna, Austria · 2023-08
First installation; the article says output goals were far exceeded in the first full year.
BFT International ↗ · Reported · press · checked
What is still missing
Payload per arm · Payload · Runtime · IP rating · Rough ground · Outdoor use
- No maker product page could be read (403); pipe sizes, laying speed and robot layout unknown.
- No price found.
- Installed anywhere besides Mischek Systembau?
Sources
2 pages- Automated bending and laying of cooling and heating pipes (BFT 08/2023) ↗BFT International · press · checked 2026-11-18
- Contact ↗Progress Maschinen & Automation AG · manufacturer · checked 2026-11-18