Progress Tube Master pipe-laying robot

by Progress Maschinen & Automation AG (Progress Group) · IT

Robot for precast plants that bends heating and cooling pipes and lays them on the pallet on top of the reinforcement for slabs with activated concrete cores, replacing manual pipe laying. Developed by Progress Maschinen & Automation and first installed at Mischek Systembau near Vienna.

No picture published

Buy in Germany

checked 2026-11-18

Sellers, prices and stock as their pages showed them. No enquiry is sent from this site.

Price on requestOrder on request

Sold on request by the Progress Group from Brixen (Italy, EU). No price published and no German installation found; the first unit runs in Austria. The maker's product pages beyond the shuttering robot returned 403 to the polite reader.

Checked 2026-11-18.

Key facts

All specifications
Moves on
Not published
Height
Not published
Weight
Not published
Arms

1

Hands

Process tool

Payload per arm
Not published
Carry on body
Not published
Runtime
Not published
Max speed
Not published
Stairs
Not published
Outdoors
Not published
IP rating
Not published

Jobs

In daily use 1

  • Place electrical boxes, conduit and small inserts before concretingIn daily use · Mischek Systembau GmbH, Gerasdorf near Vienna, Austria

Where it has worked

  • In daily use

    Bends and lays heating and cooling hoses for activated-core floor slabs in three shifts, up to 300 m² a day · Mischek Systembau GmbH, Gerasdorf near Vienna, Austria · 2023-08

    First installation; the article says output goals were far exceeded in the first full year.

    BFT International ↗

Specifications

3 values

Specifications by configuration

1 configuration

What each version's maker or seller states, with the exact source text. A source label says who makes the claim, not that it is proven; unknown means not published.

Progress Tube Master pipe-laying robot3 specifications · 7 research gaps · reviewed Show all 3 specifications and capabilities
Task
bending and laying heating and cooling pipes for activated concrete coresReported · pressBFT International ↗ · checked
Exact source text
bending and laying pipes for precast concrete elements with activated concrete core
Laying position
directly on top of the inserted reinforcementReported · pressBFT International ↗ · checked
Exact source text
The system is capable of laying pipes directly on top of the previously inserted reinforcement and replaces tedious manual work
Daily output
300 m²/dayReported · pressBFT International ↗ · checked

up to; 3-shift operation at Mischek Systembau

Exact source text

Quote context: up to; 3-shift operation at Mischek Systembau

The Tube Master is currently running a 3-shift operation from Sunday, 10 pm, to Friday, 10 pm, with a daily output of up to 300 m².

Capabilities and equipment

Legs
NoField-level source not recorded
Wheels
NoField-level source not recorded
Tracks
NoField-level source not recorded
Level floors
YesField-level source not recorded
Rough ground
Unknown
Stairs
Not applicable
Outdoor use
Unknown
Number of arms
1Field-level source not recorded
Hands or end effectors
ToolField-level source not recorded
Hands included
YesField-level source not recorded
Payload per arm
Unknown
Payload on body or base
Unknown
Runtime
Unknown
IP rating
Unknown
SDK / development interface
Unknown

Operating conditions and configuration notes

  • Works in a pallet circulation plant; it was fitted into an existing line for semi-finished precast components while production continued.
  • Pipes still need fastening on the pallet after laying (minimum rework, per the article).
  • Robot type (gantry or arm), pipe diameters and speed are not given in the text read.

Still missing for Progress Tube Master pipe-laying robot

Payload per arm · Payload · Runtime · IP rating · Rough ground · Outdoor use · SDK / development interface

Background sources for the capability record

These sources are attached to the record as a whole. Only a source displayed beside a value is linked to that field.

More detail

Evidence profileShow

Robot evidence profile

Checked

Evidence for each configuration

Claims, demonstrations, pilots and deployments describe different levels of evidence. A demonstration does not establish working-site readiness.

Progress Tube Master pipe-laying robot1 deployment · 6 missing capability fields
  1. Deployment

    Bends and lays heating and cooling hoses for activated-core floor slabs in three shifts, up to 300 m² a day

    Mischek Systembau GmbH, Gerasdorf near Vienna, Austria · 2023-08

    First installation; the article says output goals were far exceeded in the first full year.

    BFT International ↗ · Reported · press · checked

What is still missing

Payload per arm · Payload · Runtime · IP rating · Rough ground · Outdoor use

  • No maker product page could be read (403); pipe sizes, laying speed and robot layout unknown.
  • No price found.
  • Installed anywhere besides Mischek Systembau?