AES Maximo solar installation robot

by Maximo (incubated by The AES Corporation) · US

Tracked robot that lifts solar modules onto single-axis trackers with one robotic arm and tightens the clamps with a second, lower arm, guided by lidar and cameras. Developed by the power company AES and its incubated company Maximo and used on AES solar projects in the United States.

No picture published

Buy in Germany

checked 2026-11-18

Sellers, prices and stock as their pages showed them. No enquiry is sent from this site.

Not sold hereNot sold in Germany

Not offered in Germany or the EU: Maximo is used on AES's own US solar projects (Oak Ridge in Louisiana, Cavalier, Bellefield in California). AES calls it construction equipment for EPC companies and developers, but no sale, rental or service offer outside the US was found.

Checked 2026-11-18. Maker’s page ↗

Key facts

All specifications
Moves on

Tracks

Height
Not published
Weight
Not published
Arms

2

Hands

Grippers

Payload per arm
Not published
Carry on body
Not published
Runtime
Not published
Max speed
Not published
Stairs
Not published
Outdoors

Yes

IP rating
Not published

Jobs

Specs fit 41

  • Blast-clean steel before coatingCorrosion protection on steel structures
  • Bring drinks and room-service items to hotel room doorsHotel corridors and room-door handoff points
  • Carry meals from the restaurant pass to table handoff pointsRestaurant dining areas
  • Collect manure from solid barn floorsDairy cattle barn
  • Compact trench backfill layer by layerEarthworks
Show 36 more
  • Cut and joint studs and beamsPrefab timber house factory
  • Cut stock mesh to size and cut out openingsRebar cage and formwork preparation
  • Deliver requested supplies to hospital wardsHospital ward and supply-room routes
  • Feed reinforcing bars to the shear and bending machinesRebar cage and formwork preparation
  • Fit tilt-and-turn hardware to window sashesJoinery, window and door manufacturing
  • Glue and apply multi-layer sheathingPrefab timber house factory
  • Handle full OSB and gypsum boardsPrefab timber house factory
  • Insert insulation batts into the frame baysPrefab timber house factory
  • Insert studs into the framePrefab timber house factory
  • Lay and compact an asphalt course with a paver and rollersRoads, paths and paving
  • Lay concrete paving blocksRoads, paths and paving
  • Load beams onto the drill and saw line and take the cut parts offSteel fabrication shop
  • Mechanically weed vegetable rowsOutdoor crop field
  • Move meal and linen carts between hospital departmentsHospital corridors and support departments
  • Mow new lawns until acceptanceLandscaping
  • Nail and staple sheathing to the framePrefab timber house factory
  • Pick bagged plaster and mortar onto customer palletsMaterial yard and warehouse
  • Pitch and drive steel sheet pilesSpecialist foundation works
  • Place electrical boxes, conduit and small inserts before concretingPrecast concrete plant
  • Push dairy feed back toward cattleDairy cattle barn
  • Recover beverage cartons from paper linesMaterial recovery facility
  • Recover light recyclables from residue beltsMaterial recovery facility
  • Remix feed along a cattle feed tableDairy cattle barn
  • Run the mixing and pumping plant that feeds the printerConstruction 3D printing
  • Saw and rout boards, cut openingsPrefab timber house factory
  • Scrub corridor, lobby and hall floorsFacility operation and building inspection
  • Seed and hoe planned row cropsOutdoor crop field
  • Set and strip shutters on the palletPrecast concrete plant
  • Sort bulky waste into recoverable fractionsMaterial recovery facility
  • Sort construction waste into the separate fractionsConstruction cleaning and waste
  • Spot-spray selected plants in supported cropsOutdoor crop field
  • Take cut plate parts off the cutting table and sort them by assemblySteel fabrication shop
  • Take large-bore pipe bars from the rack and cut them to lengthBuilding-services prefabrication (TGA)
  • Turn elements for the second sidePrefab timber house factory
  • Unload floor-loaded cartons from containersConstruction logistics hub
  • Weld the seams of plastic roofing membranesRoofing and roof waterproofing

Where it has worked

2024202520262024-07 · Tested in a pilot · Nearly 10 MW of modules installed in field use at launch · United States (sites not named in this source)2026-03 · In daily use · Installed 100 MW of solar modules on a 1 GW project with a fleet of four robots working in parallel · AES Bellefield project, Kern County, California, USA
In daily useTested in a pilot1 more without a date
  • In daily use

    Installed 100 MW of solar modules on a 1 GW project with a fleet of four robots working in parallel · AES Bellefield project, Kern County, California, USA · 2026-03

    Figures are from Maximo's own announcement.

    Solar Power World ↗
  • In daily use

    First utility-scale deployment, installing modules on a 260 MW solar project · Oak Ridge Solar, Louisiana, USA

    The AES Corporation ↗
  • Tested in a pilot

    Nearly 10 MW of modules installed in field use at launch · United States (sites not named in this source) · 2024-07

    The AES page (s1) calls the Cavalier solar project Maximo's first MW-scale deployment.

    The Robot Report ↗

Specifications

7 values

Specifications by configuration

1 configuration

What each version's maker or seller states, with the exact source text. A source label says who makes the claim, not that it is proven; unknown means not published.

AES Maximo solar installation robot7 specifications · 6 research gaps · reviewed Show all 7 specifications and capabilities
Crew
2 peopleManufacturer sourceThe AES Corporation ↗ · checked

one drives the system, one runs the machine

Exact source text

Quote context: one drives the system, one runs the machine

Maximo can be run by installation crews of two people.
Installation rate
more than one module per minuteReported · pressSolar Power World ↗ · checked

version 3.0 units at Bellefield

Exact source text

Quote context: version 3.0 units at Bellefield

Maximo’s version 3.0 units’ technical performance rate consistently surpassed one module per minute
Modules per shift hour per person
24 modulesReported · pressSolar Power World ↗ · checked

up to; Bellefield crews, about double traditional methods in the region

Exact source text

Quote context: up to; Bellefield crews, about double traditional methods in the region

crews installing as many as 24 modules per shift hour per person
Power source
mobile microgrid with lithium iron phosphate batteriesManufacturer sourceThe AES Corporation ↗ · checked
Exact source text
Maximo runs on a mobile microgrid, using lithium-ion iron phosphate batteries as a power source.
Sensors
lidar and camerasManufacturer sourceThe AES Corporation ↗ · checked
Exact source text
Computer vision: Lidar and cameras provide spatial awareness for precise placement.
Arms
upper arm places panels, lower arm tightens clampsManufacturer sourceThe AES Corporation ↗ · checked
Exact source text
A high-speed robotic arm performs the precise panel installation. The lower robotic arm tightens the clamps for fully automated installation.
Units working in parallel at Bellefield
4 robotsReported · pressSolar Power World ↗ · checked

2026

Exact source text

Quote context: 2026

a coordinated fleet of four Maximo robot units operating in parallel

Capabilities and equipment

Legs
NoField-level source not recorded
Wheels
NoField-level source not recorded
Tracks
YesField-level source not recorded
Level floors
NoField-level source not recorded
Rough ground
YesField-level source not recorded
Stairs
Not applicable
Outdoor use
YesField-level source not recorded
Number of arms
2Field-level source not recorded
Hands or end effectors
GripperField-level source not recorded
Hands included
YesField-level source not recorded
Payload per arm
Unknown
Payload on body or base
Unknown
Runtime
Unknown
IP rating
Unknown
SDK / development interface
Unknown

Operating conditions and configuration notes

  • Tracks for sandy, muddy and bumpy ground (maker).
  • Moved between rows with a human operator; a skid steer driver tows the robot (maker).
  • Stops when it detects people in the working area (maker).
  • Works with any solar module and a growing range of clamps, rails and trackers, at different torque-tube heights (maker).

Still missing for AES Maximo solar installation robot

Payload per arm · Payload, both arms · Payload · Runtime · IP rating · SDK / development interface

Background sources for the capability record

These sources are attached to the record as a whole. Only a source displayed beside a value is linked to that field.

More detail

Evidence profileShow

Robot evidence profile

Checked

Evidence for each configuration

Claims, demonstrations, pilots and deployments describe different levels of evidence. A demonstration does not establish working-site readiness.

AES Maximo solar installation robot1 pilot · 2 deployments · 5 missing capability fields
  1. Deployment

    Installed 100 MW of solar modules on a 1 GW project with a fleet of four robots working in parallel

    AES Bellefield project, Kern County, California, USA · 2026-03

    Figures are from Maximo's own announcement.

    Solar Power World ↗ · Reported · press · checked

  2. Deployment

    First utility-scale deployment, installing modules on a 260 MW solar project

    Oak Ridge Solar, Louisiana, USA · Event date not recorded

    The AES Corporation ↗ · Manufacturer source · checked

  3. Pilot

    Nearly 10 MW of modules installed in field use at launch

    United States (sites not named in this source) · 2024-07

    The AES page (s1) calls the Cavalier solar project Maximo's first MW-scale deployment.

    The Robot Report ↗ · Reported · press · checked

What is still missing

Payload per arm · Payload, both arms · Payload · Runtime · IP rating

  • Is Maximo sold, rented or offered as a service to other EPCs, and is any use outside the US planned?
  • Weight, dimensions, module weight limit and runtime per battery charge are not stated on the pages read.
  • What changes in the announced version 4.0?
View configuration specifications and source text